Skip to main content

Agricultural Sciences and Natural Resources

Open Main MenuClose Main Menu

February 2023 Building Progress

Monday, February 13, 2023

The construction site is booming with activity as work is being done on all sides of the building. The only concrete left to pour is the middle section starting with the second floor, which will be poured on Feb. 17.

 

Crane moving material

 

View of north side from the roof

 

two cranes being utilized on the construction site

 

Crane lifting material in the air

MENUCLOSE